Drying Time
There are several stages of drying or curing when a coating is applied. A line drying time recorder allows you to accurately quantify these stages in accordance with recognised International Standards.
We also supply a Minimum Film Forming Temperature Tester (MFFT) which allows for accurate measurement of MFFT and White Point Temperature (Respectively the temperatures at which a uniform coating is achieved and when a film reaches transparency)
Showing all 3 results